Wellfield piping.
Decanting Light Non-Aqueous Phase Liquids (LNAPL) from the oil/water separator on 7/16/2014
Placing the Geoprobe, using a crane, onto the wellfield to collect soil samples in late July.
Geoprobe drilling through the concrete cap for sampling.
Cooling the hot soil samples for logging and containerizing for shipment to laboratory.