Non-Time-Critical Removal Actions (“NTCRAs”) / Remedial Investigation / Feasibility Study (“RI/FS”) (1993 – 2005)

Remedial Design / Remedial Action (“RD/RA”)
(2008 to present)

Controlling Documents

NameDate
RD/RA Consent DecreeOct, 2008
RD/RA CD – Appendix A – Record of DecisionSep, 2005
RD/RA CD – Appendix B – Statement of WorkOct, 2008
RD/RA CD – Appendix C – Site Description / MapMay, 2005
RD/RA CD – Appendix D – List of Settling DefendantsOct, 2008
RD/RA CD – Appendix E – draft Declaration of Environmental Land Use
Restrictions and Grant of Easement
Jan, 2008
RD/RA CD – Appendix F – Form of Performance GuaranteeOct, 2008

Annual Reports and Five-Year Reviews

Five Year Reviews

NameDate
1st Five-Year Review (2010)Jan, 2011
2nd Five-Year Review (2015)Sep, 2015

Annual Compliance Reports

NameDate
1st Annual State of Compliance Report – 2009Apr, 2010
2nd Annual State of Compliance Report – 2010Dec, 2011
3rd Annual State of Compliance Report – 2011Jan, 2012
4th Annual State of Compliance Report – 2012Dec, 2012
5th Annual State of Compliance Report – 2013Dec, 2013
6th Annual State of Compliance Report – 2014Dec, 2014
7th Annual State of Compliance Report – 2015Mar, 2016
8th Annual State of Compliance Report – 2016Apr, 2017
9th Annual State of Compliance Report – 2017Apr, 2018

RD/RA Work Plans

NameDate
RD/RA Work PlanNov, 2010
RD/RA WP Attachment A Overburden NAPL Delineation PlanApr, 2009
RD/RA WP Attachment B Thermal Treatment Monitoring PlanNov, 2010
RD/RA WP Attachment C Thermal Treatment Performance Criteria Work PlanNov, 2010
RD/RA WP Attachment D Vapor Treatment Needs Evaluation Work PlanNov, 2010
RD/RA WP Attachment E System Design Evaluation Work PlanNov, 2010
RD/RA WP Attachment F NAPL Mobilization Assessment and Mitigation PlanNov, 2010
RD/RA WP Attachment G Post-Excavation Confirmatory Sampling PlanNov, 2010
RD/RA WP Attachment H Habitat Restoration Work PlanNov, 2010
RD/RA WP Attachment I Soil Investigation PlanApr, 2009
RD/RA WP Attachment J Vapor Control System EvaluationNov, 2010
RD/RA WP Attachment K Vapor Intrusion Study Work PlanApr, 2009
RD/RA WP Attachment L Monitored Natural Attenuation PlanNov, 2010
RD/RA WP Attachment M Pre-ISTR Preparation PlanApr, 2009
RD/RA WP Attachment N Monitoring Well Network Evaluation and Groundwater Monitoring ProgramNov, 2010
RD/RA WP Attachment O Groundwater Containment and Treatment Evaluation and Optimization Study Work PlanNov, 2010

RD/RA POP

NameDate
RD Project Operations Plan (POP)Nov, 2010
RD POP Attachment A – Site Management PlanNov, 2010
RD POP Attachment B – Field SamplingMay, 2010
RD POP Attachment C – Quality Assurance Project PlanNov, 2010
RD POP Attachment D – Health and Safety PlanNov, 2010
RD POP Attachment E – Community Relations Support PlanSep, 2010

Remedial Design Documents

NameDate
Pre-InSitu Thermal Remediation Preparation (PIPP)Apr, 2010
Updates to the Existing MODFLOW Groundwater Flow ModelJan, 2011
ISTRC Conceptual Design and Remedial Action Work PlanApr, 2010
Air Permit Equivalency Application Cover LetterJul, 2010
Air Permit Equivalency ApplicationJul, 2010

In Situ Thermal Remediation RAWP and POP

NameDate
ISTR RA Report Approval Memo from EPASep, 2015
In Situ Thermal Remediation Remedial Action Work Plan And POPMay, 2014
Appendix A – HAZOP And Constructibility ReviewJun, 2011
Appendix B – Pre-Design StudiesApr, 2010
Appendix C – Design DrawingsJul, 2013
Appendix E – SOPsApr, 2013
Appendix F – HASPApr, 2010
Appendix G -Thermal Wellfield Implementation Support PlanDec, 2013
Appendix H – Typical Equipment SpecificationsJul, 2011
Appendix I – Permit Equivalencies And ApplicationOct, 2010
Appendix J – SPCCApr, 2011
Appendix K – SRSNE ERPMay, 2014

In Situ Thermal Remediation Final Report

NameDate
Att A – Summary Of Boring DepthsApr, 2017
Att B – As-Built Drawings 11×17 FINALApr, 2017
Att C – Detailed Description Of ISTR SystemApr, 2017
Att D – TT Weekly ISTR Summary RptsApr, 2017
Att E – FINAL – SRSNE Root Cause Analysis MemoApr, 2017
Att F – SRSNE ISTR Shutdown Report Complete 4 6 15Apr, 2017
Att G – Manifest Summary Certs Of DisposalApr, 2017
Att H – Monthly Progress And IQAT RptsApr, 2017
Att I – Weekly Meeting Agenda And MinutesApr, 2017
ISTR Construction Completion Report Text And Figure 091815Apr, 2017

RCRA Cap Design

NameDate
SRSNE RCRA Cap 100pct Design Report FINAL 101916Apr, 2017
SRSNE RCRA Cap Construction RAWP Final 100pct 101916Apr, 2017

SRSNE Conceptual Site Model

NameDate
SRSNE Draft CSM Update 042715Apr, 2017

Vapor Intrusion Study

NameDate
SRSNE Vapor Intrusion Study Tech MemoDec, 2011
Vapor Intrusion Study Final Apprvl Ltr May 2012May, 2013

Open House Posters 2010

NameDate
Open House PostersJul, 2010
Weston PostersJul, 2010
TerraTherm PostersJul, 2010

Open House 2013

NameDate
Briefing BookAug, 2013
Open House Posters 2013Sep, 2013
TerraTherm Posters 2013Sep, 2013
Weston Open House Posters 2013Sep, 2013

Battelle 2016

NameDate
Battelle 2016 – SRSNE CSMApr, 2017
Battelle 2016 – SRSNE ISTRApr, 2017
Battelle 2016 – SRSNE Plume Evolution Following ISTRApr, 2017

Links

EPA SRSNE Web Page
ITRC Fractured Rock guidance
The Preliminary Close Out Report