John (Cascade Drilling) and Garrett (TerraTherm) prepare a core for determining bedrock.
Installed to date:
HO-440 (74%)
VEW-428 (78%)
TMP-60 (62%)
PMP-42 (66%)
ISTR- 3 (43%)