In-situ Thermal Remediation – Drilling Begins

In-situ Thermal Remediation – Drilling Begins

 

4-26-13-24-26-13-1

Views from southwest looking to the northeast.

 

Boart Longyear begins drilling in-situ thermal remediation (ISTR) wells, which consist of electrically powered heater wells and vapor extraction wells. Installed to date: 24 Heater Wells (HO), 24 Vapor Extraction Wells (VEW), 1 Temperature Monitoring Point (TMP), and 1 Pressure Monitoring Point (PMP).